Hello all
we had a switch failure in a 2920 Stack and received a replacement.
I wonder what are the correct steps to replace it without causing downtime.
The stack is as follow
stacking
member 1 type "J9726A" mac-address 480fcf-169d40
member 2 type "J9726A" mac-address 480fcf-170900
member 2 priority 255
exit
The "survived" member is member 2
so I thought that the correct steps could be:
- remove member 1 from configuration before powering on the new switch.
but would this remove the configuration for all the ports of member 1 as well ?
- powering on the new switch that should be taking the member 1 place
am I correct ?
can this operation cause downtime ?
thanks
SC