Comware

 View Only

proliant dl380 G6 teaming and jumbo frames

This thread has been viewed 0 times
  • 1.  proliant dl380 G6 teaming and jumbo frames

    Posted Jul 14, 2010 07:15 AM
    Hi,

    We have 2 proliant dl380 G6 servers connect to storageworks p4300 via two seperate switches. (cisco)

    On both servers I teamed 2 nic's to connect to the storage. Connected nic 1 to switch 1 and nic 2 to switch 2.

    I also configured jumbo frames on the teaming interface. To test jumbo frames I ping from teaming interface 1 on server 1 to server 2 (so via the switches). The result is:

    ping "server1" -f -l 8000
    "packet needs to be fragmented but DF set"

    If I don't use teaming and then ping with the above command everything is OK.

    Questions that I have:
    1) Is it best practice to use teaming and
    jumbo frames to connect to iscsi storage?
    2) What can be the problem with the jumbo frames not working over the teaming interfaces?

    Thx in advance,

    Ramon